纬来体育

我的联系人
拖链,chainflex® 高柔性电缆,电缆,定制系统,装配拖链

XUXIAOLING

+86 21 8036 6608
dry-tech® 轴承技术

FENGZIHUI

021-80366452

现在就更换: 来自 igus®的 motion plastics®——简单寿命更长!

耐腐蚀,坚固,可靠

igus® 拖链现已应用于成千上万的应用中——在石油钻井平台,钢厂等其他重型设备中用于引导和保护管线。 同时提供模块化设计因此安装也很便捷。 它们有良好的介质抗性,且完美适用于极端小或大的弯曲半径、重型、低柔性电缆和管线。 igus拖链可以耐受高达850° C 的碎屑
 
许多观点都证明了高性能的工程塑料拖链能在移动场合使用,特别是重载恶劣的场合。
 

JIANGUROUREN

REXIEWENDUGAODA850 °C

FUZAIKEDA600kg/m

90.000 ZHONGXINGHAOCHANGBEIKUCUN

100% NAIFUSHI

KUAISUZHUANGPEI

YITIANCHONG

ZHONGLIANGQING

JINGYINYUNXING

DIZHENDONG

MIANWEIHU

100%MIANRUNHUA

KEYIYUANZHOUYUNDONG

WUHUAHUANDEDIANLANJUANTONG

JIANSHAO80%CHULICHENGBEN

DAI36GEYUEZHIBAODEGAOROUXINGDIANLAN

JIANSHAO75%QUDONGGONGNENG

KETIGONGZAIXIANJISUAN

KEXIAZAICADSHUJU

GAOXINGJIABI

ANXUZHUANGPEI

QUANQIUFUWU

JIAOFUFUWUWEI24XIAOSHI

Application examples for heavy duty

Bucket wheel excavator

Energy chain system e-loop is used in the bucket wheel excavator of Holcim for cement production.

Energy chain in open-air storage facility for alumina production

Design and installation of a roller energy chain for outdoor use on a bauxite stockpile - an environment with extremely harsh ambient conditions.

Ejection belts

The conveyor belt conveys highly flammable sulphur and transports it to its destination in the harbour area.

Assembly robot

This robot lifts heavy work pieces weighing up to 1.7 tons.

Tunnel building crane

Tunnel construction is generally space constrained, thus requiring compact components.

输煤系统

ZHEIGEXITONGZHONGDEDIANDONGJIXUYAODALIANGDEDIANLAN。

Working platform

This new design permits a variety of multiple tunnel construction processing steps to be performed by one machine.

Transporter for steel coils

Heavy steel coils are transported here. The energy supply is recessed into the floor.

Casting implements for car rims

Automotive wheels are manufactured here using the gravity die casting process.

Zinc electrolysis, bathing halls

The sulfur fumes generated by the electrolysis are highly corrosive and corrode the customer's system. igus® products withstand these extreme conditions.

航天发射中心

igus® DEWEILAITIYUSHIWEIYIDONGGONGDIANYINGYONGSHEJIDE,QITEDIANSHITAJUYOUZHANGSHOUMINGHEJUEDUIKEKAODEGONGNENG。

重载运输车

JIANGUDEGONGNENGTUOLIANCONGJISHUSHANGHEJINGJIXINGSHANGLAIJIANGDOUSHIZHIZAOKEKUOZHANDEZHONGXINGYUNSHUCHEDESHOUXUAN。

最长行程的工程塑料供能拖链

e-chain® travel of 615 m exceeds the longest so far in the port of Singapore.

铁燧岩矿

DAIXIAYIGEZHANGDUDEGONGCHENGSULIAOTUOLIAN:550MI。

瓷砖工厂

QIANGDADEYALILAIZIYUJIANZHUCAILIAOXINGYEDECIZHUANHUICHEN。

Road construction

An asphalt finisher applies hot and cold bitumen mixtures. The e-chain® supplies the front area of the vehicle and is exposed to extreme dirt.

Heavy fillings

e-chains® for heavy-duty uses: Guiding of the supply cables of a quenching chamber, which moves toward the linked vacuum ovens.

Power plants

Safe function despite extreme dirt accumulation: Parallel facility in the waste-to-energy plant

Waste incineration plant

Safe application of e-chains® in waste incineration plant

Tunnel construction

Tunnel boring in defined sections with the assistance of an igus® e-chain system®, which guides the essential hose cables section by section.

钢厂

WENDUGAODA1200°CHUOLAIZIGONGCHANGKAOXIANGZISHIGAOYAOQIUDEHUOYAN。

Waste incineration plant

Application of e-chains® in waste incineration plants: Strong dirt with high metal content and 300,000 t waste every year.

Thermal application

igus® roller chain in power plant application: Strong dust, application of the chains in trolley and crane, the crane drive arranged in the opposite direction.

烧煤的发电厂

ZAIQIANGFENCHENHUANJINGZHONGYUNXING。GONGNENGTUOLIANYONGYUDIANCHEHEQIZHONGJI,QIZHONGJIQUDONGKEYONGYUFANFANGXIANG。

Offshore industry

High pressure hydraulic hoses + power cables. Extreme weather environment but this chain delivers and delivers.

烧煤的发电厂

YONGYUXIEMEIJIDETUOLIANXITONG。SANNIANWUGUZHANGYUNXING。

Ship unloading crane

Application of e-chain® systems in ship unloader

Offshore industry

Tube handling plant provides an igus® plastic e-chain®. e-chain® ensures high stability and reliability in pipehandling.

Steel works

Extremely difficult conditions: Dirt and dust, heavy filling, long travel and high temperatures. The system functions since 2003.

Mining industry

The e-chain® is located in the area of the rotating assembly in a bucket-wheel excavator.

褐煤开采

HUOCHE180° ZHUANWANHOUJIANGMEIDAORUMEICANG。TUOLIANQUEBAOCHUANDONGZHUANGZHIDEGONGNENG。

堆肥厂

JIARE,YANMOFENCHEN,QIANGDAQISHIDU:ZHEIXIEDOUZHISHIDUIFEICHANGDEYIXIEWAIJIETIAOJIAN。

污水处理厂

DAITIDIANLANJUANZHOUDETUOLIAN - ZI2000NIANQIZAIWUSHUICHULICHANGZHENGCHANGWENDINGDIYUNXING

混凝土切管机

ZAIZHONGZAIXINGYINGYONGZHONGDEHUNNINGTUQIEGEJI,MIANWEIXIUQIKEZHANGDASANNIAN

卸船机

441 m travel: Reduction of tensile forces by about 75%.

污水处理厂

SHIYONGDE igus® WEILAITIYU,ZHIZHIJINRI,YIJINGJIANSHAOLEDALIANGDEWEIHUCHENGBEN。

Sewage treatment plant

The existing system with a motor cable drum proved to be not resistant enough in the difficult outdoor environmental conditions, and was replaced by a flizz® system.

Piling and drilling rigs

The driven boring machine produces extremevibrations and heavy soiling duringthe work process.

Dismantling tool

Flexible chainflex® CF9 control cables and various hoses in zig-zag application.

Maintenance-free operation for 8 years

The energy chain employed in 2000 runs smoothly.

室内及室外起重机

HUWAIQIZHONGJIBIXUNENGGOUCHENGSHOUELIEDETIANQITIAOJIAN。SHINEIQIZHONGJIYEKEYIZAIJIAOTIDESHIDUYINGXIANGXIAGONGZUO,TONGSHIJUYOUJIGAODEWENDU。

Deep drilling system TBA

Energy chains in automated deep drilling rig.

更多用于严苛和极端应用的案例

挪威。 用于Aker Kværner Maritime Hydraulics AS的立式应用。
装配用于半浸入式平台West Edrill。

DEGUO。 YANJIUYONGFANYINGDUIKarlsruheDECHAICHU。 DAIJUCHILIANDEHEDIANZHANDECHAICHU。

JIEKEGONGHEGUO LXINGQIZHONGJI a.s. YONGYUSHIHUICAOZUODEMOKUAIHUAGANGZHISHEJI。

JIEKEGONGHEGUO WEIYUYUNMEIJIYOUCEDEQUANFENGBITUOLIANXITONG。

JIEKEGONGHEGUO PoriciWEILAITIYUCEZ a.s. MEITANYUNSHUGONGNENG

JIEKEGONGHEGUO YONGYUDIANCHANGCANGKUDETONGFENGJI。

AODALIYADEMIDELANZHUANSHIQUANQIUZUIDADEZHUANKUAIZHIZAOSHANG!SANKUANTUOLIANZISANNIANQIANJIUKAISHILECHIXUYUNXING,XIANZAIKANQILAIRENGXIANGTOUYITIANSHIYONGYIYANG。

MAANSHANGANGTIECHANG:GAOWEN、GAOFUZAI、NONGZHONGFENCHEN、KUAIJIEZOU。

voestalpine Stahl Donawitz: ZAIGUIDAOSUOFANGGUOCHENGZHONGDEGAOWUGOUDUIJI。

SILUOFAKELVCHANG。 9NIANWUYUNXINGWENTI。 XINGCHENG 62 m,SUDU 0.3 m/s

JIEKEGONGHEGUO YONGYUDIANCHANGCANGKUDETONGFENGJI。

DEGUO。 LudwigshafenDEBASF,FEILIAODEJINGYINGCHANGSUO,ZI1998NIANQI,TUOLIAN:4040.32.250.0

AODALIYA,Niklasdorf, ABV,QUYUGONGREZHAN

YINDUDERTG,XINGCHENG:22m,TUOLIAN:5050.30.550.0,KEHU:Kalmar,YONGYUATM

SHIGAOFEN

DAI igus® TUOLIANXITONGDEANBIANJIZHUANGXIANGQIZHONGJI。 XINGCHENGZHANGDA800m。

NUOWEI:CHEXIYINGYONGZHONGDETUOLIANJIDIANLAN。YUJIEDAOHUICHENHENITUXINGCHENGRICHANGDUIBI。 GAOROUXINGDIANLANBIAOXIANFEICHANGCHUSE。

ZHONGGUODESHAGANG、GANGTIECHANG GAOWEN、GAOSU、YANZHONGFENCHEN

JIEKEGONGHEGUO CEZ a.s. CAIMEIJIGONGNENGDEMOKUAIHUASHEJI。

ZHANGXINGCHENGZAISANZHUANGHUOWUCUNCHUDEYINGYONG

BANAMADEQIZHONGJIZHIZAOZHE Noell。 YINGYONG:RTG,XINGCHENG:19.5m,GAODA60m/min。

JIEKEGONGHEGUO Kresice-LoubiZAOCHUANCHANG;HUOCHUANDEJIAYOUDIAN。

WUNIDUIFEI

MEISHANGANGTIECHANG,ZHONGGUONANJING。 QIZHONGJI、YANZHONGFENCHEN、GAOSU。

测试,测试,测试 ...

易格斯实验室

igus® YONGYOUXINGYEZUIDADECESHISHIYANSHI,YONGYUCESHITUOLIAN、GAOROUXINGDIANLAN、SULIAOZHOUCHENGYIJIHUADONGZHOUCHENG、GUNZHUZHOUCHENGHEZHIXIANZHOUCHENG、SIGANGQUDONG、YUANLIAOBANG、HUOSAIHUANDENGWEILAITIYU。

来自同一供应商

igus®工程服务

SHIXIANJIANGDICHENGBENDEYIDONGGONGDIANXITONG WEILAITIYUWEIQUANQIUDEFUZAYINGYONGTIGONGDINGZHIHUAJIEJUEFANGAN。

在线流程成本更低

igus® 在线工具

SHIYONGZHONGDUOZAIXIANGONGJU,ANZISHENXUYAOPEIZHIWEILAITIYU。 TONGGUOSHIYONGZAIXIANGONGJUJIANSHAONINDEGONGXUCHENGBEN,HAIKEDEDAOGENGDUOZAIXIANFUWU。


在此查看更多有关不同地区的有趣应用。